Luxor was dug up in 2017 to install natural gas in all the homes – great!  However, 3 years later our street is one of the last streets in Luxor still waiting for tarmacadam.  This is the story of the shocking mess we were left with, and how Amr and our guys repaired the damage themselves.

For some technical reason which I can’t figure out – I can’t embed my own video here! Please click on the link to see video of Amr’s amazing work

https://www.youtube.com/watch?v=OHxyb36pNNc